By Carrier Centre Square Mixed-Use Development

More About Downtown

The approved development will contain two four-story buildings that will have 104 apartments in total. Each of the two buildings will have a total of 76,000 square for a total of 152,000 square feet with two elevators. The buildings are designed to have 7,800 square feet of commercial space, with 5,200 square feet set aside for restaurants.

Construction is expected to begin sometime in the spring of 2023.